Following much preparation the next day (covering countertops, removing switch plates, laying out materials) we were FINALLY able to start tiling. While Adam worked on attaching the tiles to the wall, I concentrated on making the necessary cuts and being OCD about how everything was lining up. Two hours later, we had only covered about a foot and a half of wall space next to the fridge and I began to get worried that the backsplash wouldn’t be finished before Christmas.
Luckily, we started getting in the groove, and by 10:00 that night, we had completed almost the entire job. On Monday morning, we woke up
An hour in, we were both covered in a mixture of grout, water and sweat. What a perfect time for the in-laws to show up on their way home from the beach to check us out in all of our grouting glory! By the time we finished the grout and cleaned up (again), it was 10:00 and we were pooped. However, the backsplash looks fairly good overall and I think we’ll be pretty happy with it! I’m also extremely thankful we’ll be on vacation over our next long holiday weekend.
No comments:
Post a Comment